• Finance-content

Department of Finance

    Engineering Offices 2627 N. Hollywood Way, Bldg. 9, Burbank, CA 91505
    Phone (818) 565-1305 Fax (818) 450-0855


    Description: The Project includes furnishing all necessary labor, materials, equipment and other incidental and appurtenant work necessary to construct extensions of the existing reclaimed water system along Empire Avenue to the west intercepting the existing irrigation lines and extend a new reclaimed water standpipe with gate valve along the fence line inside the airport perimeter fence and extend the reclaimed water lines at the northwest corner of Hollywood Way and Thornton Avenue as more specifically described in the Contract Documents. The work will be performed in strict conformance with the Contract Documents, permits from regulatory agencies with jurisdiction, and applicable laws. .
    Pre-Bid: A pre-bid conference will be held on November 2, 2016 at 10:00AM at Burbank Bob Hope Airport Engineering office located at 2627 North Hollywood Way, Building 9, Burbank, CA, followed by a project site visit.

    Due: Qualified Contractors are invited to submit sealed bids by 2:05 P.M December 7, 2016 to the Burbank-Glendale-Pasadena Airport Authority, Engineering Office, 2627 N. Hollywood Way, Building #9, Burbank, California 91505, for Project Number E16-20, Reclaimed Water Connections.

    Contact: Plans and Specifications can be obtained from PlanetBids through the following link http://planetbids.com/portal/portal.cfm?CompanyID=21910. Call Airport Engineering at (818) 840-8840 for more information.

    Special Requirements: 1) Class A, C-27, C-34 OR C-36 License 2) California Prevailing Wages 3) Certified Disadvantage Business Enterprises and Small Businesses are strongly encouraged to participate.



    3:00 PM – 4:00 PM

    The Burbank-Glendale-Pasadena Airport Authority (“Authority”) which operates the Hollywood Burbank Airport is required to submit to the Federal Aviation Administration overall goals for participation by Disadvantaged Business Enterprises (“DBE”) in federally-assisted projects.
    The Authority’s proposed overall goal for DBE participation for Federal Fiscal Years 2017, 2018 and 2019 (October 1, 2017 through September 30, 2019) at the Hollywood Burbank Airport is 13%.
    Interested parties are invited to attend a stakeholder meeting to review the proposed goal and methodology and to provide any information that may assist in the development of the final DBE goals for the Hollywood Burbank Airport.
    A stakeholder meeting will be held on Tuesday, September 13, 2016, 3:00pm – 4:00pm at the Hollywood Burbank Airport – Skyroom, 2627 Hollywood Way, Burbank, CA 91505. Please RSVP to MDuong@bur.org and include company name, contact information and number of attendees.
    If you are unable to attend the meeting, comments may be submitted in writing to MDuong@bur.org.

























































































































































































































Water Usage Gauge