The City Council has awarded a contract to the Water Department to repair, along with other locations, the failed water line trench on Sierra Madre Villa Avenue at Sierra Madre Boulevard (southeast corner -- of Sierra Madre Villa with the broken un-even concrete in the right hand lane). This location is scheduled to be repaired late February to early March 2011.